🚀 50% OFF ALL INTERIOR PRODUCTS

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Description

 Description:

  • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
  • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
  • LONG DOG LEAD-  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI

Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Product form

 Description: LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water... Read more

Shipping times in cart.  Mid weeks
Monday to friday we offer next day delivery if the product is on stock and exceptions on holidays.

Weekends
We offer no deliveries in the weekends.

International
Depending on where you’re located, we offer next day delivery. Check status on this link

$45.00 $17.99

  • Up to 40% OFF. Discount in Cart!!!

SKU: 42288796-black-s-1-5m

    • Guaranteed secure & safe checkout.

      shop pay
    • Free shipping in the USA.
    • No hassle returns. 7 days return

    Description

     Description:

    • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
    • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
    • LONG DOG LEAD-  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

    Brand Name: STEVVEX Pets
    Model Number: ST12DB786GBI

    Type: Leashes
    Dog Leash Type: Basic Leashes
    Material: Nylon
    Type: Dogs
    Season: All seasons
    Pattern: Solid
    Feature: Personalized
    Feature: outdoor training dog leash rope
    Use for: puppy, small medium and large dog belt
    Use for 1: training, running dog lead

    Returns & Delivery

    When will my order be delivered?

    We ship worldwide. Your order will be packaged really carefully and delivered wherever you want. Delivery takes between 2-15 business days. You will receive an e-mail after ordering with more information about the delivery.

    Can I return my product?

    Orders can be returned or exchanged within 7 days of receiving the parcel, providing they are in original resalable condition.

    What can I do if my item (or part of it) is damaged?

    We work hard to deliver your items without damage. Orders can be returned or exchanged within 7 days of receiving the parcel, providing they are in original resalable condition.

    Recently viewed products

      Login

      Forgot your password?

      Don't have an account yet?
      Create account